Here is a model constructed in TBC for volume Computations. The Original ground had to have an extra excavation removed from it before we could do the volumes to it due to the tender requirements. Cleaned up the Design model and computed the Cut Fill volumes at the press of a button. Volume Comps are a breeze with TBC.
Earthworks Volume Report
Original surface compared to Design surface
Surfaces |
OG-With EarlyWorks Classification: Original Design-FSL Classification: Design |
Volumes from Surface Geometry |
Difference 114,006.5 m³ |
Material excavated 119,182.5 m³
Material placed 5,176.0 m³
Areas from Surface Geometry |
Area excavated 71,196.6 m²
Area placed 14,685.3 m²
Zero volume area 4.1 m²
Total 85,886.0 m²
Depth summary |
Maximum depth of excavated material 5.274 m
Maximum depth of placed material 1.933 m